Oil Storage Facility Construction
Oil Storage Facility Construction
Kurdistan Region, Iraq
In the dynamic energy landscape of Kurdistan, Motor Force Company (MFC) embarked on a monumental journey in Oil Storage Facility Construction. Completed in December 2022, this project showcased MFC’s prowess in delivering comprehensive solutions adhering to globally recognized design, fabrication, and construction practices.
Project Highlights:
The scope of work undertaken by MFC encompassed a multitude of critical aspects, ensuring a holistic and seamlessly integrated oil storage facility.
- Construction and Provision of Materials:
- MFC assumed responsibility for the entire construction process, from initial groundwork to the final touches. The provision of high-quality materials underscored MFC’s commitment to durability and longevity.
- Temporary Works and Material Handling:
- MFC meticulously managed temporary works, ensuring a smooth transition between construction phases. Material handling was executed with precision to optimize efficiency.
- Plate Rolling and Erection:
- Plate rolling, a critical aspect of tank fabrication, was executed with precision, guaranteeing structural integrity. Erection procedures were seamlessly integrated into the construction process.
- Nozzles, Cathodic Protection, Stairs, Platforms:
- MFC ensured the inclusion of essential components, including nozzles for fluid transfer, cathodic protection for corrosion prevention, and meticulously designed stairs and platforms for accessibility and maintenance.
- Miscellaneous Support Steel:
- Every facet of support steel was carefully considered and implemented, contributing to the overall robustness of the storage facility.
- Coating, Grouting, and Testing:
- MFC prioritized the protection of the facility through meticulous coating and grouting processes. Rigorous testing procedures were employed to guarantee functionality and safety.
- Mobilization and Demobilization:
- The project was executed with a strategic approach to mobilization and demobilization, minimizing downtime and optimizing project timelines.
Storage Tank – 10,000 Litre Capacity:
- Material Management, Construction, and Fabrication:
- MFC seamlessly managed materials, ensuring the construction and fabrication of a 10,000-litre capacity storage tank adhering to international standards.
- Instruments – Level Gauge, Pressure Regulator Valve, etc.:
- The scope extended beyond the physical structure, encompassing the inclusion of crucial instruments such as level gauges and pressure regulator valves, ensuring operational precision.
Conclusion
Motor Force Company’s successful completion of the Oil Storage Facility Construction project marked a significant contribution to Kurdistan’s energy infrastructure. MFC’s commitment to excellence, adherence to international standards, and comprehensive project management have elevated the region’s capacity for storing and managing oil resources.